The I-75/KY 627 interchange reconstruction project at Exit 95
The Kentucky Transportation Cabinet (KYTC) advises motorists that this advisory serves as an update for the I-75/KY 627 interchange reconstruction. The project is located on Interstate 75 at Exit 95.
Wednesday, August 7– currently and until 5 p.m. today
Southbound US 25 at the KY 627 Intersection
· temporary intermittent closures in both directions are in effect at milepoint 25.373
o the closure time is approximately 15 minutes in length
o the closures are necessary for pipe installation operations
Note: flaggers are onsite guiding and directing motorists through the area











