advertisement
loader-image
Richmond, KY
1:59 pm, Sep 6, 2026
temperature icon 84°F
broken clouds
Humidity: 75 %
Wind Gust: 2 mph
Clouds: 65%
Sunrise: 7:11 am
Sunset: 7:59 pm
advertisement
advertisement
advertisement
advertisement

Rolling Roadblocks on I75 for Scheduled Pothole Repairs

The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled pothole repair operations.  Rolling road blocks will be utilized for the work.

Wednesday, Sept. 25 – 12 a.m. (midnight) until 6 a.m.

Interstate 75 – Southbound

Pothole repair work will be in effect for the following location:

·         between milepoints 80.0 and 73.0 (the Madison-Rockcastle County line)

Note:  the rolling road block (a mobile operation) will begin Southbound at milepoint 86.0

The Southbound On Ramps (one ramp at a time) will be blocked for short periods (10 – 15 minutes):

·         Exits 76 and 77

The traveling public should expect delays during the hours of scheduled repair operations.

All work is scheduled on a tentative basis, and subject to change depending on weather, emergencies, and other factors beyond the control of the Department of Highways.

advertisement
advertisement
advertisement
advertisement
advertisement
advertisement
advertisement
advertisement
advertisement

Related Posts

advertisement
advertisement
advertisement
advertisement
advertisement
advertisement
advertisement
advertisement