advertisement
loader-image
Richmond, KY
2:36 pm, Sep 26, 2026
temperature icon 74°F
clear sky
Humidity: 38 %
Wind Gust: 0 mph
Clouds: 0%
Sunrise: 7:28 am
Sunset: 7:28 pm
advertisement
advertisement
advertisement
advertisement

Pothole and asphalt repair continues through Saturday for Clays Ferry Bridge I-75

The Kentucky Transportation Cabinet (KYTC) advises motorists that operations are scheduled for the Clays Ferry Bridge on Interstate 75. Corrective work is necessary which will include; restriping paint on the Southbound side, pothole patching and repairing asphalt at a bridge end. The Kentucky State Police will be assisting with traffic control.

Interstate 75 – North and Southbound• lane closures will be necessary between milepoints 96.9 and 98.3 through today, April 21. The center and right/slow lane will be closed today, April 21 through Friday, April 22 – 8 p.m. Thursday evening until 4 a.m. Friday morning

• Northbound – the center and right/slow lane will be closed Friday, April 22 through Saturday, April 23 – 8 p.m. Thursday evening until 4 a.m. Saturday morning• Northbound – the left/fast lane will be closed

advertisement
advertisement
advertisement
advertisement
advertisement
advertisement
advertisement
advertisement
advertisement

Related Posts

advertisement
advertisement
advertisement
advertisement
advertisement
advertisement
advertisement
advertisement